Squirrel Hill
bathroom remodel
A 1930 Squirrel Hill bathroom updated with fresh function and careful planning
This Squirrel Hill bathroom renovation focused on updating the second-floor hall bathroom in a 1930 home on Beechwood Boulevard. The project was planned as a gut remodel while keeping the main fixtures in their existing locations. The goal was to refresh the bathroom, address problem areas, and improve the overall function of a space used every day.